GEOPRO

Project Number: 851816
Funded under: H2020-EU.3.3.2. - Low-cost, low-carbon energy supply

Geothermal Emission Gas Control

Start Date

End Date

Status

1.November 2019

31.October 2022

Ongoing

About the project:

Total Cost
EUR 
4.898.982,50

Topic:
LC-SC3-RES-14-2019 - Optimising manufacturing and system operation

Total Grant
EUR 4.898.982,50

Call for proposal:
H2020-LC-SC3-2019-RES-TwoStages

Coorinator:
TWI Limited

Funding Scheme:
RIA - Research and Innovation action
 

More information about the project is here.

Homepage: GEOPRO

Linkedin page: GEOPRO

Objective

Rigorous thermodynamic models are crucial to understanding the properties of geological fluids. However, geothermal power plants lack high-precision models, which can be used to plan and test the efficiency of system operations. As a result, operators often resort to empirical in situ trials. The EU-funded GEOPRO project will produce experimental data on heat and mass transfer behaviour of high-concentration fluids in very high temperatures. Data will serve as input in a set of new design and operation tools that should allow the geothermal power plants to design and operate systems more effectively, reducing the levelised cost of energy to competitive levels.

Coordinator

TWI Limited                                                              Iceland

Participants

Beneficiaries:

University of Iceland (UIce)

Iceland

Eidgenoessische Technische Hochschule Zuerich (ETH Zürich)

Switzerland

Centre National De La Recherche Scientifique CNRS (CNRS)

France

Zorlu Enerji Elektrik Uretim AS (ZOREN)

Turkey

Flowphys AS

Norway

Technovative Solutions Ltd (TVS)

United Kingdom

Orkuveita Reykjavíkur SF (OR SF)

Iceland

Equinor Energy AS (Equinor)

Norway

Norges Teknisk-Naturvitenskapelige Universitet NTNU (NTNU)

Norway

Pfalzwerke Geofuture GmbH (PH GmbH)

Germany

Universitaet Zu Koeln (UoC)

Germany

 